Our lot in early May '06Tuesday, March 24, 2009
The work finally begins
Our lot in early May '06Sunday, March 22, 2009
Neat new blog tools

Saturday, March 21, 2009
Getting ready for the drive


Tuesday, March 17, 2009
Waiting for the final plans
Here on the home front, the bathroom remodel continues. I finished the tile work in the sink area earlier this week and installed the new cabinets on Thursday morning. Late Thursday morning, the granite guy arrived to intall our new granite counter.

Before the Bathroom Remodel

Sunday, March 8, 2009
The Money Pit-continued


Next door neighbors' lot
We are working on the design for the house, but things have slowed down a bit. With our contractor busy with the neighbors house and the new surprises on our lot, changes will need to be made.
The size of the cavern and the amount of water that was flowing out to the ocean side of our property last November, makes me think if I really want to block that flow of water with rocks and fill. The pictures below show the stream coming out from under our property during the time when I visited in November '08, after heavy rain the weeks before. In the last picture you can actually see ripples in the water from the amount of water flowing out into the ocean. I would conservatively estimate the water flow at 5+ gallons per minute or at least 72,000 gallons a day. That is a lot of water to block or detour.
With our neighbors deciding to fill their lot, it will push that water to one side or the other, or both. If we fill our lot, that would only add to the blockage and push it further on to our neighbors lots. And our future neighbors may also opt for fill, which would only seem to compound the problems. Could there be enough water to undermine the rocks and fill? Nobody seem to know for sure. Are we willing to take a chance that it won't? I don't know right now.
But if we decide to go with pilings, it adds to the cost of building and may also bring the wrath of the neighbors who don't want pilings driven at the Shores. But it can keep our house stable and not affect the flow of the underground river. It will require a redesign of the plans to incorporate pilings, so that will also add to the cost factor. We will seek opinions, but in the end it will be our decision to make.
Tuesday, March 3, 2009
We Found the Money Pit

I think we have found the actual money pit! Phil Freytag, our soil inspector said he could see 50-100 feet back towards the road, and it extended to both lots. Not news we wanted to hear. Our options are limited but it looks as though we are going to driving piles to support the house. The up side is the house is very stable. The down side is the cost. The approx. cost to drive piles is around $500US each. That includes the pile, the pile driver, transportation costs and cutting to final size. The bad news from Phil was that the current design will need 25-30 piles to be driven. Not the news I was hoping for.
The neighbor building on the lot next door is down there for the construction, but it looks like there may be a redesign of their plans, so he may spend a good amount of time just waiting for things to happen. I have no idea how long it takes to order and receive pilings. Phil still needs to look at the engineering of driving piles and attaching them to the main structure. Will I need them for the garage as well? If I do, should I go ahead and drive them now while all the equiptment is there on the property? A whole new list of things to think about. As it looks now, my drive down has been moved back to around the first of April.
I also need to make the septic water drains to an evaporation mound and not percolate thru the ground to the caverns. I don't want to be swimming in septic water! The house foundation is three feet above the gound level so we should have the area and slope to make an evaporation mound work. Another thing to look up on the web.
I'm glad to have a little more time before I leave for Belize. I am remodeling the master bathroom in our current home and I am just laying the tile floor. The tile needs to be in so we can install the cabinets, and the cabinets need to be in so the granite fabricator can take the measurements to cut the granite. And the granite guy will be here this Thursday!
I have faith that I will finish it in time. After the granite guy comes by, I will need to start painting. Mischelle is busy stripping the wallpaper from the bathroom walls. When she finishes I will add a orange peel coat to the walls for texture then go ahead and paint after that. The granite bath counter should be back and installed by Monday.
Monday, March 2, 2009
Not So Fast

Thursday, February 26, 2009
Slowly Moving Along
I have started looking at tankless water heaters as a way to save on energy costs. The problem has been finding one that will run on Butane. All manufactures list natural gas or LP but I can't seem to get a straight answer on Butane. It is only a few thousand BTU's hotter than LP, so I can't imagine there would be a problem. I will also be using Butane for our stove and oven so those are other applications I need to look into.
Other issues that need to be dealt with are a DSL/phone connection and a whole house or connection point UPS (uninterrupted power supply). Do I use diesel or Butane for the back-up generator? Is solar going to be cheaper in the near future?
Sunday, February 15, 2009
Disney's Club 33
(http://en.wikipedia.org/wiki/Club_33). For every real Disney fan, the holy grail is an invitation to the Club 33. It begins with passes to both parks for all the invited. We have been lucky and have had two opportunities to visit the Club. Once for lunch and now, once for dinner.
All too quickly the night came to an end. A stroll down Main Street with its lights bright against the night sky. The sparkles of the the fireworks, the loud boom echoing after the explosion of light. Tinker Bell floats across the sky. Another good day at Disneyland.
Wednesday, February 11, 2009
The Plans Come Alive
View looking South
View looking West
View looking to the Northwest

1st Floor layout
With the computer generated views, it starts to make the home come alive. We need to make the changes we want and get them back to John as soon as possible so he can make the changes to the foundation plans. Soon after that, John will send us site and elevation plans along with the revised foundation plans.
John has been very easy to deal with and very professional in his business, especially from what you may expect from a third world country. He has given us a "Schedule of Work" along with a schedule of payments. He has requested no upfront payments to start the job and expects to get paid after he finishes each stage of his scheduled work.
Schedule of Work
Schedule of Payments
If everything goes as scheduled, John has given us a completion date of June 8th, just one day after Mischelle's birthday. What a birthday present!
Saturday, January 31, 2009
We have a Plan
The cost to build, of about $67-$70 per square foot, is right in line with what I was expecting to pay. I was hoping that with the cost of cement and rebar, both being lower this year, the cost to build would be a little lower. But I don't think that the prices have filtered down to the contractors, yet. Suppliers are probably locked in a price contract for a year. Maybe when we build the second floor, prices will be lower.
John Harris will draw up the plans and FedEx them to us for revisions. He expects that to take about a week to ten days. The tenative date to break ground is March 16th. I plan on being there for most of the building.
Thursday, January 29, 2009
Choices
1.Go ahead and build it all at one time. Two level with a garage and a pool.
2.Build the two level with a garage, no pool.
3.Build two level with pool and no garage.
4.Build two level, no pool and no garage.
5.Single level with pool and garage.
6.Single level with only a garage.
7.Single level with only a pool.
8.Single level only. No pool, no garage.
Now we have to go over the pros and cons of each option. If we build it all at one time, will we have the extra money for appliances, furniture, moving expenses, etc. Sometimes you forget those extra expenses and they can add up quickly. I'd hate to have a new home and no money to finish the move.
I'm leaning towards a single level ( with everything ready for a second floor ) and the pool. During the summer, it would be nice to go in the pool instead of the bay. The pool water would probably be cooler. Also, it would leave money for all the additional surprises. We don't really need the garage right away and could build it next year.
But the wife is another story. She wants it all. She's afraid that the second floor won't get built if we wait. That's the master bedroom and bathroom. She wants her dream home and that's what I promised her if we moved to Belize (I just didn't say how long it would take to build it). So now starts the give and take. I give, she takes. What can I say, I'm a sucker for a beautiful woman.
Wednesday, January 28, 2009
We have a Response

With the time table he has given us, our house would be done by late June or early July. And at that point I had also better start looking for hurricane protection for the windows. I don't plan on using plywood because of the storage problems. The high humidity and the bugs would ruin plywood after a few years, anyway. Some of our neighbors in the Shores are using a corrigated sheet metal bought from company in Belize City. It looks like it's a good product and fairly easy to install. The other thing I will need to look at is the air conditioning. With the hot and humid days and nights of summer, we will need a place to retreat and get cool.
With a start date on the calendar, there are so many things to do. Now the fun really begins.
Wednesday, January 21, 2009
Still waiting for a response.

Mischelle at the Slot Tournament
Part of Ceasar's Palace at night
Me at Jimmy Buffet's MargaritavilleI' m sure not as young as I use to be. Those late nights take their toll. You lose track of time in the casinos, and they keep the inside so bright. We saw a few of the tourist spots, shuffled between casinos and generally had a good time.
With the drive just a little over 4 1/2 hours, we took the Avalanche truck because the gas is fairly cheap ( $1.99 gal.) and flying takes just as long with all of the security, getting to the airport, etc., and that's with no delays.
Monday, January 12, 2009
Waiting for a response
We have sent off our plans to John by way of snail mail, so we hope he receives them sometime this month. He will look over the plans and give us an estimate of the per square foot cost. Now we need to look into housing for the duration of the construction. There is a small house across the street going for $500 mo., but I'm not sure if it has air conditioning. You need a/c for the dog days of summer. At least somewhere to retreat, during the hot, humid days and nights. It will also get us ready for life in the Shores. No real stores near-by and only a couple of resturants with differing schedules.
It's also time to begin packing things for the move. The BIG garage sale. No winter clothes. I'm ready to go!
Monday, January 5, 2009
Finding a Contractor
Sunday, January 4, 2009
The New Year
Monday, December 22, 2008
3 days to Christmas


Friday, December 19, 2008
The trip to Belize
The last post was 2 weeks before I left for Belize. The trip to Belize this time was to find a contractor to build our new home. I had a few contractors we were interested in contacting and a few I found while I was down there.
The flight was from LA to Dallas and then on to Belize. It was not that bad, but it was a full flight. About 8 hours total to get to Belize, then on to get the rent a car at the airport. I rented a car from Belize Auto Rental and was very pleased with the car, the service and the price. The car was a 2005 Kia Sportage with 100K on it. Fairly good on gas and only $540 US for 10 days including CDW and taxes.
The flight was about 10 min late and Customs was slow due to the amount of people on the flight. By the time I got through Customs and got the rent a car, it was getting close to 5pm and sunset is around 5:30pm. I had a 2 hour drive to Corozal and I was going to spend half of that driving on the Northern Highway at night. I was not looking forward to that part of the drive. It was my first trip driving from Belize City to Corozal.
The Northern Highway wasn't that bad, but with no streetlights except in towns, no center divider lines, no lit signs, it could be easy to lose your way in the dark. And everybody rides bikes on the road, sometimes two or three abreast, and dressed in dark colors. A scary drive to be sure. I would not do that again in the dark unless I had to. And the sleeping policemen (speed bumps) are in all the towns and not that clearly marked. I think I hit a couple of them doing 40 mph or so. It's no wonder the shocks in the cars are the first to go.
I arrived in Corozal around 7:00pm and still had to find the road out to Consejo. After finally locating the road, I arrived in Consejo around 7:30pm. I was staying at Bob and Martha's place right across the street for the Customs station. Nice place close to the water and in the small town of Consejo. They rent out a large studio apt downstairs for about $25-$40 a night, depending on the length of the stay.
After a day of travel, I went to sleep early and awoke with the sun. I put together my list of things to do and was headed to town by 8am. My first objective was to get a SIM card for my cell phone. I went to BTL and of course they were closed. Monday to Friday only. I went to another store that I was told would have SIM cards, but they were out of new ones and only had used ones. I didn't want someone's old telephone number, so I decided to wait until BTL opened on Monday.
A friend in Consejo Shores had asked me to pick up some Sage while I was in town, for the Thanksgiving turkey. I went to 5 different stores and none of them had any Sage. In fact, they pretty much all have the same things in all the stores. That's why when you shop in Corozal, you may have to visit many places to find what you need. And most of the stores seemed to be run by Chinese. There are also a lot of Chinese food restuarants in town. In fact, a lot more than any other restuarants. I haven't tried any yet but was told a few of them are rather good.