Friday, April 24, 2009

Day 2 of driving piles.

The truck with the needed pilings showed up a little late today and they started driving piles around 9AM. They have ten piles to be driven, so everything should be wrapped up by today.



John Harris and Zane, the owner of the piling company.

Cutting the piles down to size.




Watching piles being driven is like watching paint dry... not very exciting. Or at least that's the way you want it to be. And the shaking of the ground was almost non-existant. From Pip and Jasons' place, next door, you couldn't tell there were piles being driven. No ground movement at all.




As it gets closer to the end of the day, the last two piles are left to be driven. It's almost over. Or so I thought. The last in a series of piles that had all been driven down about 30 feet, we were going to sink a 40 footer. That would leave about 10 feet of piling, exposed above ground. And that would be cut to 3 feet with the top 1 foot of concrete broken off to expose the steel strands just like the others in the previous pictures. But watching them drive this pile was different. After the first 3 or 4 feet of topsoil, the pile dropped 6 feet in one pounding. The next pounding, another 4 feet disappeared. Ten feet in two poundings. We are now down 15 feet and sinking fast. But, if the results are the same as the previous pilings in this row, the resistance should start at about 25 feet and stiffen up at around 29-31 feet, just like the six more before in the same area.


Unfortunately, this was not to be the case this time. The pile driver kept driving, and our pile kept sinking. 20, 25, 30 feet went by, just like that. The other piles were now at the same height, but this 40 foot pile had more to go. 35 and now 40. The pile driver now has the piling at ground level. And still has more to go. Then we find the cavern.



The pile driver has now pounded this 40 foot pile, 44 feet in the ground. It is at this point that the piling has finally met stiff resistance. Four feet below gound level we found an open cavern that was large enough to probably stand inside. Phil has given his OK to stop driving the pile.



Cutting the piling to expose the rebar, below ground level.

John will form up a cast with rebar and type 1 cement to bring this post up to the correct height. He said it's not a problem to do this. So that will be done another day. We have finished driving piles. And that's a good thing. We may fill in a portion of the cavern, but there is no need to crush and fill it all. That's why we went with the pilings. It turned out to be a wise decision.




Everyone is happy that the pile driving is done!

Sunday, March 8, 2009

The Money Pit-continued

After looking over the options available to us after the excavation of the money pit, neither is very good. Do we crush in the cavern then fill it with rocks and marl or do we drive pilings and add a substantial amount to the build cost. Our neighbors next door, that were having their lot cleared when they came across the cavern, have decided to use rocks and fill to level the lot so they can start building.










Next door neighbors' lot



We are working on the design for the house, but things have slowed down a bit. With our contractor busy with the neighbors house and the new surprises on our lot, changes will need to be made.


The size of the cavern and the amount of water that was flowing out to the ocean side of our property last November, makes me think if I really want to block that flow of water with rocks and fill. The pictures below show the stream coming out from under our property during the time when I visited in November '08, after heavy rain the weeks before. In the last picture you can actually see ripples in the water from the amount of water flowing out into the ocean. I would conservatively estimate the water flow at 5+ gallons per minute or at least 72,000 gallons a day. That is a lot of water to block or detour.










With our neighbors deciding to fill their lot, it will push that water to one side or the other, or both. If we fill our lot, that would only add to the blockage and push it further on to our neighbors lots. And our future neighbors may also opt for fill, which would only seem to compound the problems. Could there be enough water to undermine the rocks and fill? Nobody seem to know for sure. Are we willing to take a chance that it won't? I don't know right now.


But if we decide to go with pilings, it adds to the cost of building and may also bring the wrath of the neighbors who don't want pilings driven at the Shores. But it can keep our house stable and not affect the flow of the underground river. It will require a redesign of the plans to incorporate pilings, so that will also add to the cost factor. We will seek opinions, but in the end it will be our decision to make.