Thursday, March 26, 2009
False start
No, wait. Now, after the new problems developed on our neighbors' lot, that date has been moved back to March 28th.
Delays again? OK, this time I am really going to leave on March 31st. Construction is to begin April 6th... or so.
Now what! Oh, it's Easter week on the sixth, and the contractor has prior obligatons. I guess even the contractor deserves a few days off.
This is it! I'm leaving on April 2nd, no matter what....maybe.
I've sent the original truck " pink slip" to our customs broker in Texas, so all of our paper work should be good to go when we arrive. I hope to be at the border by Aprl 4th or fifth so we can cross over into Mexico early Monday morning. I would really like to be through Mexico in two days but the reality is that even if it did take only two days, we would arrive at the Belizian border too late to cross over. We would still have to get the truck and all the contents inside, cleared by the Mexican officials that handle "transmigrantes". The Belizian customs would also need to be there so we can pay our duties and taxes.
So the drive though Mexico will last three days if all goes well and we don't get lost along the way. That should put me in Consejo by Wednesday, April 8th. The construction is now scheduled to begin April 14th....Belizian time.
Tuesday, March 3, 2009
We Found the Money Pit

I think we have found the actual money pit! Phil Freytag, our soil inspector said he could see 50-100 feet back towards the road, and it extended to both lots. Not news we wanted to hear. Our options are limited but it looks as though we are going to driving piles to support the house. The up side is the house is very stable. The down side is the cost. The approx. cost to drive piles is around $500US each. That includes the pile, the pile driver, transportation costs and cutting to final size. The bad news from Phil was that the current design will need 25-30 piles to be driven. Not the news I was hoping for.
The neighbor building on the lot next door is down there for the construction, but it looks like there may be a redesign of their plans, so he may spend a good amount of time just waiting for things to happen. I have no idea how long it takes to order and receive pilings. Phil still needs to look at the engineering of driving piles and attaching them to the main structure. Will I need them for the garage as well? If I do, should I go ahead and drive them now while all the equiptment is there on the property? A whole new list of things to think about. As it looks now, my drive down has been moved back to around the first of April.
I also need to make the septic water drains to an evaporation mound and not percolate thru the ground to the caverns. I don't want to be swimming in septic water! The house foundation is three feet above the gound level so we should have the area and slope to make an evaporation mound work. Another thing to look up on the web.
I'm glad to have a little more time before I leave for Belize. I am remodeling the master bathroom in our current home and I am just laying the tile floor. The tile needs to be in so we can install the cabinets, and the cabinets need to be in so the granite fabricator can take the measurements to cut the granite. And the granite guy will be here this Thursday!
I have faith that I will finish it in time. After the granite guy comes by, I will need to start painting. Mischelle is busy stripping the wallpaper from the bathroom walls. When she finishes I will add a orange peel coat to the walls for texture then go ahead and paint after that. The granite bath counter should be back and installed by Monday.